Gallery

Project: D Street

Bathroom Remodel: Performed lead abatement and closed off an unnecessary door. Relocated the toilet and sink and upgraded plumbing, electrical and ventilation systems. Installed new drywall, texture, paint and vinyl flooring. Replaced the tub and tiled surround with a cultured marble pan and matching surround completed with a glass enclosure. Other Improvements: New composition shingle roof, full exterior paint, upgraded electrical system and installed a kitchen range ventilation system.