|
Project: Buchanan
Kitchen and Bathroom Remodels: Gutted to the studs and performed
lead abatement. Upgraded plumbing, electrical and ventilation and installed new
drywall, texture and paint. Installed new shower pan and tub and replaced
fiberglass shower surrounds with cultured marble. Installed new vinyl floors,
cabinetry, sinks, fixtures and appliances. Other Improvements: Removed acoustic
ceilings, painted interior and installed new closet doors. Replaced sewer line,
the roof and the patio overhang. |